The carpenters arrived and installed the replacement InnerMost cabinet for the one that was dropped. They did a nice job leveling and the drawers look great. They also installed factory trim around the base cabinets and brought me the shelf pins that were missing. Here is the nifty tilt-out tray installed into the sink base. The trim turned out nicely. We used oak with cherry stain for both the window trim and the baseboard. Now I can put the coat closet back together! The kids back-packs are buried in those storage boxes and we will need them soon. They added counter cleats to support the granite counter top. We are scheduled for install next Wednesday, week 10 of our kitchen remodel. We will then move the fridge back and I hope to schedule the plumber to connect the sink, dishwasher and stove by the end of the week. Our kitchen is almost done!
3 Comments
9/18/2013 07:25:17 pm
I see you have a lot of effort invested in the renovation of the kitchen
Reply
5/9/2023 11:34:55 pm
I appreciate you mentioning that the granite countertop was supported by the addition of counter studs. My mom wants to remodel the kitchen. I'll advise her to purchase the kitchen countertop.
Reply
Leave a Reply. |
KittycooksEnjoys life as a dog walker/petsitter, professional naturalist, author, landscape designer, teacher, and artist. Archives
July 2016
Categories
All
|