The drywall crew was scheduled to begin four weeks into our project. The kids drew a time capsule inside the wall during the two week wait for their permits to clear and work to begin. Crew2 showed up bright and early on the scheduled Monday. Over the next two and a half days they drywalled and mudded the room. They built a small soffit to hide the pipes above the sink and finished off the soffit that ran above the door. It looks like a room again. Up next: painting!
5 Comments
12/13/2021 12:28:30 am
I’ve desired to write something similar to this on my webpage and this has given me an idea. Cheers.
Reply
3/9/2022 02:52:05 pm
Let us handle your final drywall steps for your remodel and insure the finished project looks outstanding! Thank you for taking the time to write a great post!
Reply
4/6/2022 12:58:56 am
Hey Kitty! Like your site. You have shared amazing pictures of drywall. You did a Great Job. Keep sharing such informative post with us. Thanks for a wonderful share. Keep Going.
Reply
4/29/2022 04:03:23 am
This is such an amazing article, thank you so much for sharing. Keep up the good work.
Reply
6/15/2022 12:10:28 am
Thanks for sharing this Article. Very comprehensive. Keep it up
Reply
Leave a Reply. |
KittycooksEnjoys life as a dog walker/petsitter, professional naturalist, author, landscape designer, teacher, and artist. Archives
July 2016
Categories
All
|